Stephanie Jones and Robert Bartmann discussing architectural drawings – Theodor-Stern-Kai project in Frankfurt

The tenant fit-out of the building’s top three floors, offering impressive views, had to be delivered within a very tight programme. The greatest challenge was optimising the planning and contract award processes.

Since 2019, we have also overseen various refurbishment and maintenance works in the building, incorporating ESG considerations.

  • Tenant Studies
  • Tenant Fit-Out
  • Refurbishment
  • General Planning
  • HOAI Service Phases 1–8
  • ESG
Robert Bartmann
Robert Bartmann
Frankfurt am Main
»A delightful moment: Two cranes replacing glass windows on the 14th floor while the entire team looks on with excitement from the balcony of our office facing it«
Office tower at Theodor-Stern-Kai in Frankfurt beside a tree-lined promenade along the River Main
Glass façade with solar shading louvres and a projecting building section at Theodor-Stern-Kai in Frankfurt
Office space with floor-to-ceiling windows and far-reaching city views at Theodor-Stern-Kai in Frankfurt
Upward view of the glass façade and Allianz logo on the office tower at Theodor-Stern-Kai in Frankfurt

Related projects

corpo-two_Logo_RGBElement 1
Aktualisieren Sie Ihren Browser für vollständige Funktionalität
Wir möchten Ihnen eine optimale Nutzung unserer Seite ermöglichen und können diese nicht im veralteten Internet Explorer anbieten.

Bitte besuchen Sie unsere Seite in einem aktuellen Browser wie Google Chrome, Mozilla Firefox, Microsoft Edge oder Apple Safari.