Maximilian Heimann and Maja Groß discussing the project on site with a tablet and documents at Two Towers Berlin

As general planner, we provide tenant fit-out planning for high-quality office space with complex requirements in this high-rise building in Berlin-Mitte.

Following the fit-out of approximately 4,500 m² of lettable space for the Bundesanstalt für Immobilienaufgaben (BImA), used by a federal ministry, our work continued with the planning and fit-out of a further 1,400 m².

The former canteen and kitchen areas were stripped back to shell condition and converted into modern office space.

  • Tenant Studies
  • Tenant Fit-Out
  • HOAI service phases 1–8
Maja Groß
Maja Groß
Berlin
»The challenge as the general planner was to bring all the trades together to meet the tenant’s very specific requirements.«
Long office corridor with parquet flooring, glass partitions and exposed services at Two Towers Berlin
Digital room controller on a black column in front of glazed offices at Two Towers Berlin
Office workstations behind glass partitions beside a corridor with exposed ceiling services at Two Towers Berlin
Close-up of exposed metal ventilation ductwork at Two Towers Berlin
Lounge area with a sofa, armchairs and large windows at Two Towers Berlin
Glazed office partitions with timber doors and parquet flooring at Two Towers Berlin
Exposed ventilation ducts and cable trays beside a glass partition at Two Towers Berlin
White suspended ceiling panels beneath an exposed concrete ceiling at Two Towers Berlin
White kitchen units with an illuminated worktop and exposed ceiling services at Two Towers Berlin

Related projects

corpo-two_Logo_RGBElement 1
Aktualisieren Sie Ihren Browser für vollständige Funktionalität
Wir möchten Ihnen eine optimale Nutzung unserer Seite ermöglichen und können diese nicht im veralteten Internet Explorer anbieten.

Bitte besuchen Sie unsere Seite in einem aktuellen Browser wie Google Chrome, Mozilla Firefox, Microsoft Edge oder Apple Safari.